History of project management






Project management has been practiced since early civilization. Until 1900 civil engineering projects were generally managed by creative architects and engineers themselves, among those for example Christopher Wren (1632–1723) , Thomas Telford (1757-1834) and Isambard Kingdom Brunel (1806–1859) It has been since the 1950s, that organizations started applying systemic project management tools and techniques to complex projects.

As a discipline, Project Management developed from different fields of application including construction, engineering and defense. In the United States, the two forefathers of project management are Henry Gantt, called the father of planning and control techniques, who is famously known for his use of the Gantt chart as a project management tool, and Henri Fayol for his creation of the 5 management functions, which form the basis for the body of knowledge associated with project and program management. Both Gantt and Fayol were known as being students of Frederick Winslow Taylor’s theories of scientific management. His work is the forerunner to modern project management tools including work breakdown structure (WBS) and resource allocation.

The 1950s marked the beginning of the modern Project Management era. Project management was formally recognized as a distinct discipline arising from the management discipline. Again, in the United States, prior to the 1950s, projects were managed on an ad hoc basis using mostly Gantt Charts, and informal techniques and tools. At that time, two mathematical project scheduling models were developed. The “Critical Path Method” (CPM) developed in a joint venture by both DuPont Corporation and Remington Rand Corporation for managing plant maintenance projects. And the “Program Evaluation and Review Technique” or PERT, developed by Booz-Allen & Hamilton as part of the United States Navy’s (in conjunction with the Lockheed Corporation) Polaris missile submarine program; These mathematical techniques quickly spread into many private enterprises.

At the same time, technology for project cost estimating, cost management, and engineering economics was evolving, with pioneering work by Hans Lang and others. In 1956, the American Association of Cost Engineers (now AACE International; the Association for the Advancement of Cost Engineering) was formed by early practitioners of project management and the associated specialties of planning and scheduling, cost estimating, and cost/schedule control (project control). AACE has continued its pioneering work and in 2006 released the first ever integrated process for portfolio, program and project management (Total Cost Management Framework).

In 1969, the Project Management Institute (PMI) was formed to serve the interests of the project management industry. The premise of PMI is that the tools and techniques of project management are common even among the widespread application of projects from the software industry to the construction industry. In 1981, the PMI Board of Directors authorized the development of what has become A Guide to the Project Management Body of Knowledge (PMBOK Guide), containing the standards and guidelines of practice that are widely used throughout the profession.

The International Project Management Association (IPMA), founded in Europe in 1967, has undergone a similar development and instituted the IPMA Competence Baseline (ICB). The focus of the ICB also begins with knowledge as a foundation, and adds considerations about relevant experience, interpersonal skills, and competence. Both organizations are now participating in the development of an ISO project management standard (From Wikipedia, the free encyclopedia)

No comments:

Post a Comment